The Prime Minister Laptop Scheme 2025 has officially entered Phase 4, bringing great news for thousands of talented and deserving students across Pakistan. The government has confirmed that laptop distribution began on November 1, 2025, starting with major cities before extending to regional universities nationwide.
This phase continues the vision of building a digitally empowered, tech-savvy youth — one laptop at a time.
PM Laptop Scheme 2025 Overview
The PM Laptop Scheme is a flagship educational initiative by the Government of Pakistan, designed to bridge the digital divide and promote technology-driven learning in higher education institutions.
Launched under the supervision of the Higher Education Commission (HEC), this program provides free laptops preloaded with educational software to high-achieving students in public and private universities.
The 2025 edition focuses on supporting students excelling in academics, research, and innovation, enabling them to compete globally in a digitally connected world.
Phase 4 Distribution Details
The Phase 4 laptop distribution began on 1st November 2025, starting in Islamabad, Lahore, Karachi, Peshawar, and Quetta, and will expand to other districts throughout the month.
The HEC has assured that the process will be fully transparent and merit-based, ensuring only eligible students receive laptops.
Key Highlights:
-
Distribution Start Date: November 1, 2025
-
Organized By: Higher Education Commission (HEC)
-
Beneficiaries: Students of public & private HEC-recognized universities
-
Mode: In-person collection after verification
How to Check Your Selection Status Online
Students can easily verify their eligibility status through the official HEC portal. Here’s how:
-
Visit the HEC official website: www.hec.gov.pk
-
Click on the “PM Laptop Scheme 2025” tab.
-
Select “Check Your Status.”
-
Enter your CNIC number and security code.
-
Click Submit to view your result.
Your status will show as:
-
Selected
-
Under Review
-
Not Selected
This digital verification ensures fairness and transparency across all participating universities.
Eligibility Criteria for PM Laptop Scheme 2025 (Phase 4)
To qualify for Phase 4, students must meet the following requirements:
-
Must be enrolled in an HEC-recognized public or private university.
-
Should have a strong academic record.
-
Must be a full-time student at the time of application.
-
Students who previously received a laptop under earlier phases are not eligible.
-
Must possess a valid CNIC and university ID card.
These merit-based criteria ensure laptops go only to deserving and high-performing students.
Required Documents for Laptop Collection
Students must bring the following documents for verification and collection:
-
Original CNIC or B-Form
-
Valid University Student ID Card
-
Proof of enrollment (issued by department/university)
-
HEC or University SMS/Email Confirmation
⚠️ Tip: Double-check your documents before visiting to avoid delays or rejections.
PM Laptop Scheme 2025 – Province-Wise Distribution Schedule
| Region/Province | Start Date | Estimated Laptops | Major Universities Included |
|---|---|---|---|
| Islamabad | 1 Nov 2025 | 18,000 | QAU, COMSATS, NUST, IIUI |
| Punjab | 3 Nov 2025 | 45,000 | Punjab University, GCU, UET, BZU |
| Sindh | 5 Nov 2025 | 30,000 | Karachi University, NED, IBA |
| Khyber Pakhtunkhwa | 7 Nov 2025 | 20,000 | Peshawar University, GIKI, Islamia College |
| Balochistan | 10 Nov 2025 | 12,000 | UOB, BUITEMS, Loralai University |
This phased rollout ensures smooth delivery and equal opportunity across all provinces.
Tips for a Smooth Collection Process
To make your laptop collection hassle-free:
-
Arrive early at your assigned collection center.
-
Keep all documents organized and photocopied.
-
Carry your confirmation email or SMS.
-
Follow the instructions of on-site HEC officials.
-
Avoid rushing or crowding during verification.
Proper preparation ensures a fast and stress-free experience.
Impact of PM Laptop Scheme 2025
The PM Laptop Scheme continues to empower students by:
-
Promoting digital literacy and research innovation.
-
Supporting online education and skill development.
-
Bridging the technology access gap for low-income students.
-
Strengthening Pakistan’s digital infrastructure and youth potential.
Thousands of students across Pakistan have already benefited from previous phases — using their laptops for e-learning, freelancing, and academic research.
Final Words
The PM Laptop Scheme 2025 (Phase 4) is more than just a distribution drive — it’s a national investment in education and technology.
Students are encouraged to check their selection status on the HEC portal, gather their documents, and collect their laptops responsibly.
With this initiative, Pakistan takes another step toward a digitally advanced and educated future.